Release 15 june 2023

A package coming your way with improved functionality in the Mestro portal just in time for summer!

When logging in on Wednesday the 15th, you will now be greeted with a Budget Tool, a user-friendly solution for creating and tracking budgets at the property level. Additionally, we are introducing the option for aggregation per building instead of property, allowing for area-based allocation based on building area. We have also introduced the Power Signature, providing a daily average power report. Furthermore, we have improved the validation of Virtual Meters and changed the aggregation method to avoid issues with sub-meters. With these enhancements, you can easily manage and analyze your energy data in an even more efficient way!

Below, you can read more about each new functionality:

Budget Tool

We are now releasing the Budget Tool. In this tool, you can set up reference series based on each property's last 3 years, set a budget per property on a monthly basis, extract the figures via Excel, and update them with a forecast series for performance tracking.

Aggregation from building

Starting from the release, it is possible to configure the aggregation to occur per building instead of per property. This brings some changes to how the system functions and can only be requested through consultation with Customer Success. This enables area-based allocation based on building area and similar aspects but comes with some limitations.

Power Signature

The Energy Signature now has a sibling - the Power Signature! It is the same report but expressed in terms of daily average power instead of energy. This will also include some additional key metrics above the graph.

New Temperature Source

With this release, we have also acquired a new temperature/weather source. Following the discontinuation of Darksky, we have now switched to Weatherbit.

Virtual Meters with stricter validation

We have taken significant steps to improve the validation of Virtual Meters in various ways. For example, it will not be possible to remove a meter that is included in a Virtual Meter, which is one of the most common issues today.

Change in aggregation during active period

If a main meter has a stop time, it will be included as long as the stop time is within the requested date range. If we select a range that is after the stop time but does not include the stop time, the system used to pick up another meter. Now, this has been changed. If there is a main meter under the property, the system will assume that it is the main meter to be aggregated primarily, meaning no sub-meters will appear.

Other updates
  • Country is now a mandatory attribute when creating a property.
  • Minute resolution is now available in the Usage Analysis.
  • Automatically adjusted column width in exported Excel files.
  • New design for pie charts.
  • Cost and waste meters are grouped in the node tree.
  • The property's node ID is included in the export from the meter data status.
  • Cost and emission reports now have selectable meter types to include in the report.
  • New waste types: corrugated cardboard, light sources, and small batteries.